2022-06-202022-06-202022-06-202022-07-15http://localhost:8080/handle/prefix/2838In the Integrated Project, research was requested on a work that, by itself, has been stopped for a long time with some pathology. Therefore, an investigation of the case and its possible problems and solutions was carried out. In order to solve the problem and get a suitable way out of the obstacle in question. The landfill was analyzed, and the landfill itself was not done properly, that is, without sufficient compaction and without downstream containment works to stabilize it. Therefore, it came to bring about a series of imprudence with the houses present there and paralyzing the entire work and emerging several pathologies in this case.Acesso AbertoEngenharia CivilPatologiaEstaca MegaSPTDemoliçãoProjeto arquitetônicoCNPQ::ENGENHARIASReconstrução e adequação de residência unifamiliarRelatório de Pesquisa